Great story and proud that a Fulcrum3D Sodar was the “sophisticated equipment” referred to in the line “Before construction of five new wind turbines began in January, sophisticated equipment — which shoots sonic waves into the air to measure wind speeds — collected data for 12 months.” 

Australia’s biggest hybrid renewable energy microgrid